Announcement of the first public participation in the environmental impact assessment of the project of Xinxian Ruixinda New Material Technology Co., Ltd.


Xinxian Ruixinda New Material Technology Co., Ltd. annual output of 1 million tons of aluminum-plated zinc silicon plate project


Announcement of the first public participation in environmental impact assessment


Members of the public:


Hello


According to the "People's Republic of China Environmental Impact Assessment Law", "Interim Measures for Public Participation in Environmental Impact Assessment" (Huanfa [2006] No. 28) and "Notice of Shandong Provincial Department of Environmental Protection on Strengthening Public Participation in Supervision and Management of Environmental Impact Assessment of Construction Projects" "(Luhuan assessment letter [2012] No. 138) and other relevant regulations, the environmental impact assessment of the "Xinxian Ruixinda New Material Technology Co., Ltd. annual output of 1 million tons of aluminum-plated zinc-silicon plate project" is as follows:


1. The name and summary of the construction project


Construction project name: Xinxian Ruixinda New Material Technology Co., Ltd. annual output of 1 million tons of aluminum-plated zinc silicon board project


Summary of the construction project: The project covers an area of 22124.82m2, which mainly builds office buildings, steel rolling workshops, aluminum-plated zinc-silicon workshops, pickling workshops, raw material warehouses, finished product warehouses, auxiliary workshops, substations, sewage treatment stations, and weighbridge rooms. , Staff restaurant, dormitory and supporting facilities, etc., with a total construction area of 129560 m2.


The main construction contents of this project are one push-pull pickling production line with an annual output of 1 million tons, three six-roller reversible cold rolling production lines with an annual output of 350,000 tons, two aluminum-zinc-silicon production lines with an annual output of 500,000 tons and their public and auxiliary facilities.


The total investment of the project is 241.24 million yuan, the number of employees is 200, the working system is 300 days a year, and the production workshop and public power department adopt a three-shift two-operation system.


2. Name and contact information of the construction unit of the construction project


Unit Name: Xinxian Ruixinda New Material Technology Co., Ltd.


Contact: Zuo Guangtao


Telephone: 178063506711


3. Working procedures and main contents of environmental impact assessment


Working procedures of environmental impact assessment: accepting entrustment — understanding the project situation — consulting relevant departments — conducting environmental background checks — environmental quality status monitoring — noise, water and atmospheric environmental impact assessment — public participation — project environmental protection Feasibility and mitigation measures-prepare project environmental impact assessment report.


The main chapters of the environmental impact report: general overview, engineering analysis, environmental profile, environmental air quality status and impact assessment, surface water environmental impact analysis, groundwater environmental impact assessment, acoustic environmental quality status and impact assessment, solid waste environmental impact analysis, risk Evaluation, analysis of environmental impact during construction period, technical and economic demonstration of environmental protection measures, total discharge control analysis, cleaner production analysis, environmental economic profit and loss analysis, environmental management and environmental monitoring plan, rationality analysis of project site selection, public participation, evaluation conclusion and Suggest.

4. The main items for soliciting public opinions


This public participation mainly seeks the opinions and suggestions of the public affected by the construction of the project on the environmental impact of the construction of the project, and puts forward suggestions on the prevention and control of adverse environmental impacts caused by the construction of the project from the perspective of environmental protection, The evaluation feeds back the reasonable and feasible public opinions and suggestions to the engineering design.


V. Main ways for the public to provide opinions


If the public has environmental protection opinions on the construction project, within 10 working days from the date of this announcement, an individual or unit may submit written opinions to the construction unit and the environmental impact assessment unit of the project by letter, telephone or other means (please invite the public to Provide detailed contact information while giving your opinion).


The environmental impact assessment unit will record the public opinions and suggestions in the project environmental impact report, and reflect the public's valuable opinions and suggestions to the project construction unit, design unit and relevant departments.